Projects
4 29
Lincoln Tunnel Project


LincolnTunnelPhotosNov19#8_(600_x_399).jpg

The work consisted of rehabilitating the existing pavement in the South tube from New Jersey to New York. The Port Authority of NY and NJ awarded the job to Tilcon in July 2005. The work was to be performed at night, from Wednesday to Saturday, so as not to conflict with the heavy traffic volume traveling from New Jersey to New York. The work was completed in four weekends in October and November.

7 files

Garden State Parkway - Essex & Raritan Tolls


gsp.jpg

Tilcon was awarded the GSP Essex and Raritan Plaza one-way toll projects. The $3.6 million Essex project called for demolishing tollbooths, excavation of the existing roadways, milling and paving, and drainage installation. This was completed in 2005. The Raritan project went into effect at the Raritan and Asbury Park toll plazas, where motorists now pay a 70 cents toll at Raritan South and Asbury Park North. The high profile $10.9 million NJ Turnpike Authority contract was Tilcon’s largest construction job in 2004.

8 files

Seawall


shore-pkwy-seawall.jpg

Tilcon supplied stone from our Clinton Point facility for an emergency shoreline reconstruction project of the Shore Parkway Seawall in Brooklyn. The New York City Department of Parks and Recreation project spanned two miles from Bay Ridge Avenue to Third Avenue in the Bay Ridge section of Brooklyn, Kings County, NY. The project involved 12,000 cubic yards of 1 ½” stone, and 75,000 tons of other assorted stone sizes from ½ inch to five ton boulders.

8 files

Warren County Landfill


Landfill4_(600_x_450).jpg

A 16-acre parcel of the landfill has been filled to capacity and is being capped. After the initial regrading, six inches of sand is placed on top, followed by a plastic liner. A geocomposite layer is added next, then two feet of fill soil topped with six inches of top soil. The stone materials are being used for the construction of the 6,500 feet of drainage swales.

The stone requirements include: 50,000 tons of limestone screenings; 75,000 tons of QP; 10,000 tons of 2 ½” clean; 5,000 tons of gabion and 30,000 yards of overburden.

6 files

4 albums on 1 page(s)

Events
3 19
Bloomingdale Breaks Ground on New Public Safety Complex


Bloomingdale6.jpg

A civic partnership between Tilcon and Bloomingdale has enabled the Borough to begin construction of a new 7,200 square-foot Public Safety Complex and Emergency Management Operations Center. A ground-breaking ceremony was held on 5/2/06. Tilcon donated construction services and is providing asphalt material for the installation of the parking lot.

8 files

Clinton Point Open House 2008


CP_OH_08_6_(408_x_306).jpg

The Clinton Point Quarry Open House 2008 was a great success. Our many visitors enjoyed children's activities, quarry tours, equipment tours, food and drinks, fun and games.

5 files

Mt Hope Open House 2008


MH_OH_08_7_(408_x_306).jpg

Our 2008 Mt Hope Open House was a great success. Our many visitors enjoyed quarry tours, seeing our heavy equipment, music and entertainment, food and drinks, children's entertainment and more.

6 files

 

3 albums on 1 page(s)

48 files in 7 albums and 2 categories with 0 comments viewed 6462 times

  162 Old Mill Road, West Nyack, New York, 10994  Tel. 1 (845) 358-4500
© Copyright Tilcon New York Inc. All Rights Reserved. Privacy Policy | Terms of Use | Site Map
Visit the Webmaster - Northern Pride Design